Was riding in Wales last weekend around Trawsfyndd nuclear power station - first gen magnox and I think the only one in the UK on a lake. Decommissioning proceeds apace - should be complete 2083.
Was reading that the second gen AGR design is now considered one of the most expensive failures of UK infrastructure spend / planning ever. Set back the UK nuclear industry a decade, before the mass hysteria of the 80s killed it for good (in terms of UK being a technical and engineering leader in nuclear, which it should have been given the start it had).