I was there mate and came away with the feeling that there's a real will to make Bramley Moore work, but they were trying to manage expectations a little in case it doesn't happen.
There are obviously some issues, but I'd put it at 80%+ likely that we'll end up down in the docks.
If we don't, then it won't be because of a lack of effort.
That was mainly my point, the desire is defo there, but thats not always enough.
Just out of interest, what are the main issues (on the surface of it - obviously not the main details)?
Is it all down to land ownership, infrastructure etc?








