that canada dock line was tested and infact had a train carrying councilors run up and down it from edge hill about two years ago, its development was linked in with liverpools new ground if it goes over sixty thousand they have to commit to building a station at cherry lane, liverpool as you have seen have lowerd the new capacity to just below the figure , dont think its something they want to pay out for the sums wernt that high either.
The loop line that goes up towards norris green /west derby cant be used as the council have allowed it to be build on for about 150 meters, not the best planning there.
As for a link to the airport , it was looked into when they opened south parkway, it isnt that long that need linking in ,as a track along side the old ford factory ran most of the way but was deemed as to expensive cant see any movement at all in the rail infastucture in merseyside for a long time, they also looked at opening the line down to brunswick from edge hill the engineers said the tunnels ect are fine they were repaired in the seventys despite not being used for far longer than that, thats not going to get done either if i was putting money on it the canada dock line would be favorite to get done ,if merseytravel get control of there own infastucture, something thats been muted for a few years , as it would open up there network to the mainline
The loop line that goes up towards norris green /west derby cant be used as the council have allowed it to be build on for about 150 meters, not the best planning there.
As for a link to the airport , it was looked into when they opened south parkway, it isnt that long that need linking in ,as a track along side the old ford factory ran most of the way but was deemed as to expensive cant see any movement at all in the rail infastucture in merseyside for a long time, they also looked at opening the line down to brunswick from edge hill the engineers said the tunnels ect are fine they were repaired in the seventys despite not being used for far longer than that, thats not going to get done either if i was putting money on it the canada dock line would be favorite to get done ,if merseytravel get control of there own infastucture, something thats been muted for a few years , as it would open up there network to the mainline