Full on designs are a good way off I'd say. Whenever planning permission is sought - I'd say early next year as a realistic point for that - then we'll see designs.
The concept design will be made available; but with regards to everything else, I'd say you're correct
 
	 
 
		 
 
		 
 
		
 
 
		
 
 
		 lol
lol 
 
		 
 
		 
 
		 
 
		 
 
		







