Some utter wankstain who was supposed to turn up yesterday didn't turn up, today must've been a bit of a chore for him too so he can p1ss off. I've wasted 2 days leave sitting in for this belter.
The job is to finish removing old kitchen (I've already got rid of wall units and all doors, just floor units that would need utilities turning off first. I will dispose of units once they are out) and fit secondhand wall and floor units. Job will need a bit of gas work to remove and replace gas hobs, fitting a consumer unit and adding an extra socket or two, plumbing in a dischwasher that is additional to what is currently in, cut and fit worktops and skim the back wall where tiles have been taken off. We are just off j11 of m62.
The job is to finish removing old kitchen (I've already got rid of wall units and all doors, just floor units that would need utilities turning off first. I will dispose of units once they are out) and fit secondhand wall and floor units. Job will need a bit of gas work to remove and replace gas hobs, fitting a consumer unit and adding an extra socket or two, plumbing in a dischwasher that is additional to what is currently in, cut and fit worktops and skim the back wall where tiles have been taken off. We are just off j11 of m62.